Sunday, December 14, 2008

Marathon Sunday

Today was Honolulu Marathon. Once again my wife and I got up at 2:30 A.M. to help. We are members of the clock team. Our job is to start all of the clocks along the route. I manned the one mile clock, partnered with a newbie named Nick, and my wife had the two kilometer clock. About a dozen team members meet at Fort DeRussey in Waikiki at 3:30 for a final time check and last minute instructions, then we all ride our bikes to our station and wait for the 5:00 start. My wife and I ride all the way from home, and after watching the first few hundred runners go by head off in search of breakfast. Well, today it rained. Hard. By the time we got to Big City Diner in Kaimuki we were soaked to the bone, so we road on home, got cleaned up, and went back. After a leisurely breakfast we went home, and on the way we could still see runners headed out. The magnitude of these events never fails to amaze me.

A lack of sleep was not the only thing that interfered with working on the E9 today. Since Friday I have been struggling with a bout of vertigo. On Saturday I doubted I could ride a bike Sunday, but with the help of Dramamine I managed. I had Nick go up the ladder to start the clock, while I called out the time. The two things that trigger a dizzy spell are looking up and, even more so, looking down. Needless to say, working on the E9 was a challenge.

The first thing to do was to smooth out the putty I applied at the end of last week's session. I started with my pneumatic grinder, then switched to a sanding block. The tricky part was to sculpt the indentation where the panel changes height. I ended up with one low spot. After the next patch is welded in place I can add enough filler to even out the surface. I think I have reached the point where I need to sand down more of the rear end, so see why there is so much bondo.

When I got the sculpting as far as I wanted to take it I still had enough time to cut out the next patch. Next week will begin with grinding it down to fit, and preparing the opening.

BMW121408-01 BMW121408-02 BMW121408-03

BMW121408-04 BMW121408-05 BMW121408-06

Tuesday, December 9, 2008

First Time Using Fiberglass

When I discovered POR-15 I read about a particularly interesting application, patching holes with fiberglass cloth. Apparently POR-15 works like polyurethane resin. Sunday was my chance to try it out.

The area I selected was where the rear panel has a height change. The rust hole -- more like a slot -- is where the panel curves in and under, just above the joint with the trunk floor. I decided to put the glass cloth on the inside, and later-on fill in the low spot with epoxy filler.

The first order of business was to strip off the primer I had used in the area, as well as a bit more of the ridiculously thick layer of bondo that I find all over the rear-end. For that I used a small die grinder and a beefy looking wire brush I picked up at Redline. Unlike other wire brushes, this one seems indestructible. Next came the standard POR-15 prep, a wash and an application of rust converter. One thing I did not do but probably should have was to rough up the bare metal with my grinder or some #80 sandpaper, to give the patch something to hold on to.

BMW120708-01 BMW120708-02
BMW120708-03 BMW120708-04

I already had a tube of POR PATCH, the type of POR-15 that comes in a tube, and because it seems a little thicker I decided to use that. The first bit that came out was runny so I put the cap back on and kneaded the tube a bit ... not easy with a metal tube. I used a wood tongue depressor to spread the POR PATCH and work it into the cloth. The rounded end was perfect for the curve in the metal.

BMW120708-05 BMW120708-06

When that was done I still had a little time left so I applied some Epoxy Putty to some of last week's patch. I stayed away from the lower areas because I anticipate welding there. I was especially interested in the lower right corner of the tail light opening. I finally used the last of the first box I purchased to use on the rear windowsill.

BMW120708-07 BMW120708-08 BMW120708-09

Sunday, November 30, 2008

Another patch welded on

This week picked up where last week left off. But first, I promised to take a picture of my E9 clock, and here it is. They are; I took two.
BMW113008-01BMW113008-02

Last week I made the Z-bend for the taillight flange. Today began with trying to hammer a little curvature into the patch, to match the curvature of the body. It does not need to be perfect because it will be finished with POR-15 Epoxy, like the window sill, but a little shape will minimize the thickness. In the process I decided that the only way to cope with the extra thickness along the right edge, caused by a previous repair, was to cut away the upper portion of the flange. That side would have to rely on an upper and lower tab for strength. The upper tab ended up rather small, and I might add some strength there in the future.

I don't think it shows up in the photos but I used a shrinking hammer on the narrow section of the Z-bend, and used the flat - curved face hammer in the picture on the larger faces, hammering into a shot bag. Worked rather well.
BMW113008-03BMW113008-04

After a thorough scrub with acetone I punched some holes along the flanges to weld through. The places without holes are blocked on the inside. Notice how narrow the top edge became after trimming to fit the taillight opening. That goes back to the Z-bend not ending up exactly where I intended. Oh well, practice makes perfect.
BMW113008-05BMW113008-06

For welding I tried a slightly lower voltage and I held the tip closer to the bead. The welds I did today came out a little better than the last couple of times, except where I welded on the outside. Maybe I needed more light.

Outside (new patch to your left)
BMW113008-07BMW113008-08 BMW113008-09

Inside (new patch to your right)
BMW113008-10BMW113008-11

In this last photo I tried to show where the extra layer of sheet metal interfered with the flange I started out with. The original metal can be seen just above the new welds on the inside of what appears to be a previous repair to the same area. My new patch is on the left.
BMW113008-12

Sunday, November 23, 2008

New Rear End Patch

I need to come up with a better way of describing these patches. How many more "new" patches will I make before the job is done? Maybe I should number them.

This one is directly under the left tail light. Actually it is where the bumper attaches. There appears to be some previous repair work in this area, old enough to find lead filler.

Today I fabricated the patch. For this one I decided to use the flanger. The left, right, and bottom edges will get a small flange from my pneumatic flanging tool. The top needs a deeper flange for the bottom edge of the tail light. Next time I will try to curve it a bit, but even so I anticipate bringing the surface up to hight with filler.

I made the first right-angle bend for the top in the vise. I did not align the hardwood form just right, so the bend ended up a little higher than I wanted. I think there is enough along the bottom edge to compensate.

The send right-hand bend was tricky. I ended up champing the piece to the steel workbench and bending in over the thick steel plate you can see in the background. Came out pretty good. What I need is a break ...

BMW112308-01

BMW112308-02 BMW112308-03

BMW112308-04BMW112308-05

Monday, November 17, 2008

Rear End Outer Layer

This week's work was completely straightforward because it continued the work done last week. The main order of business was to weld on the outer layer of the patch I started on last week But before getting to that I spent a few minutes mounting the E9 wall clock I picked up on EBay. Would you believe I did not get a picture of it? Maybe next time.

It was the E9 club badge I wrote about a few weeks ago that got me thinking about how my corner of the shop looks. Dreary, for sure. The bay is, well, just a bay. It would not be so bad if there was a beautiful car parked in it. Like beautiful women, a beautiful car can overcome a host of minor flaws. Likewise a plain car generates few expectations. A once beautiful car turned ugly, though, is depressing. This is why I bought the clock. To compensate, to cheer the place up. It's not as if I constantly need to know what time it is.

So the first real work was to drill a bunch of holes to spot weld the patch through. Good thing I bought that new set of drill bits! next I wiped down both mating surfaces with acetone and shot them with Weld-Thru Primer - a.k.a. Weld-Thru Coating. after that is was just a matter of welding it on.
BMW111608-01BMW111608-02
BMW111608-03BMW111608-04

Sunday, November 9, 2008

Dealing With Surface Height Changes

Last week I spent more time planning than executing. That's not a bad thing. When I was in high school I built my own sail boat, and one of the many lessons I learned was measure twice, cut once. I lofted the hull full size on the garage floor and must have walked a hundred miles just walking across the floor to check it.

The upshot of all this is that today I realized that the height change I talked about last time had an impact I had not counted on in the area by the tail light. The good news is that I started the day planning rather than cutting, so I figured out what was wrong before it became a problem. The solution was to use a two layer patch. The last patch was supposed to be at surface level. In fact it is one layer down.

My basic plan for welded patches-not that I have done very many-is to use a picture frame backplate that supports a surface level patch. In the area I am working in now, that plan is inadequate due to the lack of structural integrity around the opening. For this reason I went with a solid patch.

First I made the surface level patch. Not hard even though none of the sides are square. I just held a piece of cardboard against the opening and marked it, then cut it and trimmed here and there. When the pattern fit I transfered it to steel.

The backing plate was even easier. It needed to be 1/2 in. wider and 1/4 in. higher. I had just enough time to weld on the backplate. I finished by covering all the exposed surfaces with POR-15 Metal Prep.

Sunday, November 2, 2008

More Work on Back

I just watched the Colts beat the Patriots. This was the first game in weeks worth watching. Not that I get to watch very many. The Colts especially looked like a Super Bowl team, far more so than the Titans in spite of the difference in their records.

Last week it was too wet to paint the window sill, but today was perfect. That was the last thing I did, so I wouldn't get muck in the wet paint.

The focus of the day was how to repair rusted areas on the rear end where it joins the trunk floor. The original design has a narrow "Z" fold running horizontally accross the entire rear panel, just below the tail lights. The area of the fold is rusted through in several places. I decided not to attempt to recreate the fold, given my lack of skill and the tools available.

Plan A is to recreate the effect by welding up pieces of sheet metal, overlapping at the edge, then smoothing the joint with Epoxy Filler.

I was about to implement plan A in the area below the left tail light when I started thinking like a dentist -- save as much as possible. I ended up reattaching the two sections still remaining after wire brushing away the rust. Next I'll have to add a backing plate, the bottom edge at the joint I worked on today. If that doesn't work it's back to plan A. Because I'll be doing more work in this area next week I skipped painting and instead treated the area with POR-15 cleaner and metal prep.

BMW110208-01

BMW110208-02 BMW110208-03

BMW110208-04 BMW110208-05

BMW110208-06 BMW110208-07